Project Stats

Contract Value: 16

169,000 •

Services Provided

  • Industrial Buildings

This project consisted of site development and new construction of a 165,000 SF structural steel Bagging Warehouse Building, and two pre-engineered metal buildings, an Administration Building and Switchgear Building.

Project Details

  • The structural steel bagging warehouse was designed to withstand 140mph wind loads.
  • The mechanical systems include propane heaters, restroom exhaust fans, mini-split AC units, and rooftop spark-resistant fans for the switchgear building.
  • Moore self-performed the concrete foundations and plumbing scopes for this project.