Moore Industries was contracted to perform selective concrete demolition, site grading, and the installation of limestone to accommodate lay down space for the Life Extension 2 (LE2) project at the Strategic Petroleum Reserve.
Project DETAILS
- Moore demolished all existing fencing, concrete paving, foundations, pedestals, drilled piers, and plastic pipe in the construction area.
- Once demolition was complete, Moore graded the site for installation of structural fill, geotechnical fabric, and limestone.




Let’s discuss your project
Contact us today to see if Moore Industries can assist you with your construction project.