This project involved the comprehensive replacement of the HVAC system within a two-story, 20,000-square-foot laboratory, which remained fully operational 24 hours a day, 7 days a week throughout the project duration.
Project DETAILS
- The scope of work included the demolition and replacement of all HVAC equipment and related components. New installations consisted of an air handling unit, steam-to-hot-water heat exchangers, and advanced HVAC instrumentation and controls.
- The project utilized in-house resources for the design, fabrication, and installation of chilled water piping and ductwork, ensuring precision and quality control.