EXXONMOBIL

Project Stats

Contract Value: $12mm

Services Provided

  • Industrial HVAC

This project involved the complete replacement of the HVAC system in a 36,000-square-foot laboratory that operated continuously, 24 hours a day, 7 days a week, throughout the duration of the work.

Project DETAILS

  • The scope of work included the demolition and replacement of all HVAC equipment and associated components. Key elements replaced were the chiller, cooling tower vertical pumps, chilled water and condenser water pumps, condensing units, air handling units, split system units, variable air volume (VAV) boxes, variable frequency drives (VFDs), exhaust fans, and ductwork. Each component was carefully selected and installed to ensure seamless operation and maintain uninterrupted functionality of the laboratory.
  • Additional work included upgrading fire suppression systems, concrete equipment foundations, chill water piping, membrane roof replacement, and asbestos abatement.
  • Electrical infrastructure upgrades, the erection of a structural steel conduit bridge, and interior finishes were also part of the scope.
Logo of the U.S. Federal Election Commission featuring an American flag motif with stars and stripes.
A blue
Logo with an orange hexagon and the letters
ConstructSecure Platinum Safety Award medal for 2020 with a blue and silver design.
Logo of the Construction Industry Advisory Council with purple and gold colors, featuring the initials
Logo of the Louisiana Mid-Continent Oil and Gas Association, featuring the letters
Logo with a blue diamond shape featuring
Large steel-frame structure under construction, with cranes and construction materials on site, against a clear blue sky.
background metal texture

Let’s discuss your project

Contact us today to see if Moore Industries can assist you with your construction project.

Reach Out Today