Moore was contracted to furnish and install 11 modular blast-resistant buildings and associated infrastructure/utilities.
Project DETAILS
- The project involved receiving, offloading, and placing 11 BRBs to upgrade existing electrical systems and installing underground and above-ground plumbing for perimeter and building fire protection sprinkler systems.
- A 500-ton hydraulic boom crane was used for the lifts, requiring precise positioning to avoid existing structures.
- Strong communication and ongoing coordination were essential to ensure the lifts were completed safely and efficiently.