Moore Industries
  • Who We Are
  • Capabilities
    • Pre-Construction
    • Construction
    • Maintenance
  • Experience
  • Safety
  • Careers
  • Contact
  • Employee Portal
  • Who We Are
  • Capabilities
  • Experience
  • Safety
  • Careers
  • Contact
  • Employee Portal
225-751-4120
10037 Baringer Foreman Road
Baton Rouge, LA 70809

Get Directions
Back
Capabilities
    Pre-Construction Construction Maintenance

Experience

  1. Home
  2. Experience

Dow Blast Resistant Control Room

100,000 SF two-story Blast Resistant Control Room Building which consisted of a control room, laboratory, office space, locker rooms, restrooms, and kitchens.
View Project

Exxon Lube Warehouse

85,000 SF blast-resistant multipurpose building which included a 7,000 SF build-out with offices and conference rooms.
View Project

Entergy MCPS Project

This Design-Build project included a 15,000 SF warehouse, a 3,000 SF Control Building, and a 7,500 SF Demineralization Water Building.
View Project

ExxonMobil Baton Rouge

BRCP CPMO & LAB Hardening

The design intent of this unique project was to provide structural steel exoskeleton reinforcement to an existing, occupied, 50-year-old, 4 story office building and 2 story laboratory in order to increase the building’s blast/ impact resistance.
View Project

Quality Assurance Laboratory HVAC Modifications

This project was a complete replacement of the HVAC systems within the facility’s Quality Assurance Laboratory building. This unique project required the demolition and installation of all components of these systems within an 36,000 sqft active laboratory which is in operation 24 hours per day.
View Project

LE2 Road Upgrades

This project consisted of seven and a half miles of asphalt paving, asphalt milling, drainage improvements, reinforced concrete pipe installation, demolition of existing steel cattle-guard structures, installation of pre-cast concrete components, roadway striping, signage, and seeding.
View Project

CF Industries AM5 Civil & Structural Upgrades

This project included lifting an 85,000 lbs Substation building with a 500-ton crane (over existing buildings) and placing on top of 9 ft concrete piers that were installed by Moore’s Team.
View Project

Sasol K059B Maintenance Buildings

This Design-Build Project included a blast resistant 85,000 SF Maintenance Building and an 8,400 SF Workshop Building.
View Project

CPL HVAC Mechanical Equipment Installation

This project was for the ExxonMobil Chemical Plant Laboratory in Baton Rouge which is a critical operation for the ExxonMobil complex. It took 13 months to complete in a fully occupied and operating laboratory with no interruptions to business operations. Moore was able to complete the project 5 months ahead of schedule.
View Project

CPL HVAC Control System

Moore designed and installed a completely new Building Automation System (BAS) to monitor and control the newly installed equipment for the CPL HVAC Mechanical project.
View Project

ExxonMobil Bad Actors

This project required Moore’s Mechanical team to remove and replace 18 specialized air handling units. These critical units served MCC’s,
View Project

EMPR Chill Water Plant

This project included removing and replacing chilled water plant for a three-story Admin Building.
View Project

Who We Are

Capabilities

  • Pre-Construction
  • Construction
  • Maintenance

Experience

Safety

Moore Industries Logo
©2023 Moore Industries | All rights reserved. | MODIPHY® DESIGN | Moore Industries - Industrial General Contractor